The Project consists of several new structures as well as additions to existing structures. There will be three neww 100' in diameter Sludge Storage Tanks. Two new concrete Final Settling Tanks, 100' in diameter with 15' high walls. New Sludge Mixing Building, one story precast concrete building. There will be a one story brick and block addition to the existing Grit Chamber / Blower Building. The existing Primary Settlimg Tanks, Aeriation Tanks, and Pipe Gallery will be extended. The new structure will add six new Primary Tanks and six new Aeration Tanks. The total addition length will be approximately 190 feet, with the Pipe Gallery connecting the two types of structures. The project is scheduled to be completed in the fall of 2003. Photo Gallery |
|
Last Updated ( Wednesday, 16 August 2006 )
|